素混凝土桩复合地基两种成桩工艺对比分析
摘要:通过对两栋楼素混凝土桩复合地基检测实践,对采用两种不同成桩工艺的素混凝土桩桩身质量问题及复合地基承载力大小进行了对比分析,说明在西安这一类型场地,对于素混凝土桩复合地基处理方案而言,采用螺旋钻机成孔工艺成桩要优于采用锤击沉管成孔工艺。
Abstract:By means of static loading test and pile dynamic test methods, two buildings' composite foundation with plain concrete pile are tested. By contrasting of the plain concrete pile integrity and the composite foundation's bearing capacity for the two types of construction technology, it is proved that in the region of Xi'an, the twist drill concrete pile is better than the driven cast-in-place pile.
中文标题:
素混凝土桩复合地基两种成桩工艺对比分析
Comparison for the Composite Foundation with Plain Concrete Pile by Two Types of Construction Technology
作者:
张慧海,郑建国,邢心魁
ZHANG Hui-hai,ZHENG Jian-guo,XING Xin-kui
作者简介:张慧海,1977年生,男,汉族,山西太原市人,2001年毕业于西安建筑科技大学,现主要从事岩土工程测试工作。
通讯地址:
机械工业勘察设计研究院, 西安 710043
中图分类号:TU472
出版物:岩土工程技术
收稿日期:2003-04-16
网络出版日期:2021-07-21
关键词:素混凝土桩复合地基,成桩工艺,桩身质量
Key words:composite foundation with plain concrete pile,construction technology of pile,Pile integrity
文档包含图片数量:图片(0)张
文档包含表格数量:表格(0)个
参考文献:
基金项目:
- 文件大小:
- 322.8 KB
- 下载次数:
- 60
-
高速下载
|