武汉地铁二号线一期工程岩土工程勘察特点分析
摘要:通过对武汉市轨道交通二号线一期工程沿线区域地质构造、工程地质和水文地质特点的分析,说明了在不同地貌单元和不同地质条件下针对地铁施工工法、进行岩土工程勘察的基本内容和方法,指出了地铁勘察在场地条件、勘察要求、试验内容等方面不同于一般的工业与民用建筑岩土工程勘察工作的特点,并据此合理安排勘察实施方案。
Abstract:Through an analysis to the features of the regional geology structure, the engineering geology and the hydrology geology of the first-phase project of Wuhan NO. 2 subway line, the basic content and method is showed for geotechnical engineering investigation to the different method for the subway construction under the different physiognomy unit and the different geological condition. In addition, it is pointed out that the features of subway investigation which is different of the general industry and civil construction investigation in aspects on location condition, investigation request and test content. The investigation implementation can be plan reasonably according to these featuers.
中文标题:
武汉地铁二号线一期工程岩土工程勘察特点分析
Analysis on Geotechnical Engineering Inuestigation Features of the First-phase Project of Wuhan No.2 Subway Line
作者:
彭友君
PENG You-jun
作者简介:彭友君,1962年生,男,汉族,湖南桂阳县人,高级工程师,从事岩土工程勘察、岩土工程设计与施工、岩土工程测试、检测、监测、监理工作。E-mail:pengyj0005@163.com
通讯地址:
北京城建勘测设计研究院有限责任公司, 北京 100101
BeijingUrbanConstructionExploration&SurveyingDesignInstituteCo.Ltd.,Beijing100101China
中图分类号:TU412
出版物:岩土工程技术
收稿日期:2006-09-12
网络出版日期:2021-07-06
关键词:武汉地铁,地貌单元,测试试验,勘察特点
Key words:Wuhan subway,physiognomy unit,testing experiment,investigation features
文档包含图片数量:图片(0)张
文档包含表格数量:表格(0)个
参考文献:
基金项目:
- 文件大小:
- 447 KB
- 下载次数:
- 60
-
高速下载
|
|