沈阳地铁隧道开挖方案技术优化研究
摘要:依托沈阳地铁工程项目,以青年大街—怀远门区间段的地铁隧道施工为背景,应用FLAC软件进行数值模拟分析。针对沈阳的地质情况以及各种开挖方式的适用范围和特点,主要采用全断面法、双侧壁导坑法、保留核心土台阶法三种方案进行模拟分析,并根据监测点位移、围岩的弹塑性状态、锚杆轴力及衬砌内力等对开挖方式的合理性进行研究。
Abstract:This paper based on shenyang subway project. Conceiving the weekend interval period metro tunnel construction as the background and the application of FLAC numerical simulation analysis software. According to the geological conditions, various of shenyang excavation method applicable range and characteristics of main adopts full section method, double meshshotereting firstly method, retain earth steps method are simulated and analyzed in three ways. and also according to the monitoring displacement, the surrounding elastic-plastic state, anchor axial force and lining of internal rationality of such excavation methods.
中文标题:
沈阳地铁隧道开挖方案技术优化研究
The Excavation Scheme of Shenyang Subway Optimize Technology Research
作者:
王铁男1,杨青潮2,郝哲2
Wang Tienan1,Yang Qingchao2,Hao Zhe2
作者简介:王铁男,1984年生,男,黑龙江呼兰人,硕士,从事岩土工程领域的研究工作。E-mail:wtienan@163.com
通讯地址:
1. 北京市勘察设计研究院有限公司, 北京 100038; 2. 沈阳大学建筑工程学院, 辽宁沈阳 110044
1.BGIEngineergingConsultantLtd,Beijing100038,China; 2.ShoolofArchitecturalEngineering,Shenyang,Shenyang110044,Liaoning,China
中图分类号:U455
doi:10.3969/j.issn.1007-2993.2012.03.003
出版物:岩土工程技术
收稿日期:2012-01-09
网络出版日期:2021-07-06
关键词:数值模拟,开挖方式,优化分析
Key words:numerical simulation,excavation way,optimization analysis