摘要:深圳某地铁共建管廊项目采用土压平衡盾构施工,在施工掘进过程中,连续出现出渣量超挖、超排,刀盘"结泥饼",刀盘转矩异常增大,掘进速度降低,总推力异常增大,螺旋机出渣口有喷涌,地面沉降大,掘进效率低等情况,对施工过程进行总结分析,根据盾构在块状强风化、中风化砂岩地层施工掘进中遇到的问题提出应对措施.

Abstract:Ametroco-constructiontunnelprojectinShenzhenadoptsearthpressurebalanceshieldforconstruction.Intheprocessofconstructionandexcavation,therearecon-tinuousoccurrencesofsituations,suchasover-breakingandover-dischargeofdregs,mudcakeonthecutterheadabnormalin-creaseinthecutterheadtorquedecreaseintheexcavationspeed,abnormalincreaseinthetotalthrust,gushingatthedregout-letofthescrewconveyor,largegroundset-tlementandlowexcavationefficiency.Theconstructionprocessissummarizedandanalyzed,andcountermeasuresarepro-posedaccordingtotheproblemsencoun-teredintheconstructionandexcavationofshieldinblockystrongly-weatheredandmoderately-weatheredsandstonestrata.

作者:邹景军Author:
作者单位:中铁工程服务有限公司
刊名:工程机械
Journal:ConstructionMachineryandEquipment
年,卷(期):2024, 55(7)
分类号:
关键词:盾构掘进  超挖  结泥饼  掘进参数异常  块状风化砂岩  
Keywords:Shieldexcavation  Over-break-ing  Mudcake  Abnormalexcavationpa-rameter  Blockyweatheredsandstone  
机标分类号:U455.43U231.3TU433
在线出版日期:2024年7月23日
基金项目:块状风化砂岩地层盾构掘进关键技术研究[
期刊论文]  工程机械--2024, 55(7)邹景军深圳某地铁共建管廊项目采用土压平衡盾构施工,在施工掘进过程中,连续出现出渣量超挖、超排,刀盘"结泥饼",刀盘转矩异常增大,掘进速度降低,总推力异常增大,螺旋机出渣口有喷涌,地面沉降大,掘进效率低等情况,对施工过程进...参考文献和引证文献
参考文献
引证文献
本文读者也读过
相似文献
相关博文

        块状风化砂岩地层盾构掘进关键技术研究  Research on Key Technologies of Shield Excavation in Blocky Weathered Sand-stone Strata

块状风化砂岩地层盾构掘进关键技术研究.pdf
2024-12-14 03:29 上传
文件大小:
10.55 MB
下载次数:
60
高速下载
【温馨提示】 您好!以下是下载说明,请您仔细阅读:
1、推荐使用360安全浏览器访问本站,选择您所需的PDF文档,点击页面下方“本地下载”按钮。
2、耐心等待两秒钟,系统将自动开始下载,本站文件均为高速下载。
3、下载完成后,请查看您浏览器的下载文件夹,找到对应的PDF文件。
4、使用PDF阅读器打开文档,开始阅读学习。
5、使用过程中遇到问题,请联系QQ客服。

本站提供的所有PDF文档、软件、资料等均为网友上传或网络收集,仅供学习和研究使用,不得用于任何商业用途。
本站尊重知识产权,若本站内容侵犯了您的权益,请及时通知我们,我们将尽快予以删除。
  • 手机访问
    微信扫一扫
  • 联系QQ客服
    QQ扫一扫
2022-2025 新资汇 - 参考资料免费下载网站 最近更新浙ICP备2024084428号-1
关灯 返回顶部
快速回复 返回顶部 返回列表