admin 发表于 2025-1-18 14:30

粉喷桩处理软基固结计算方法的探讨


粉喷桩处理软基固结计算方法的探讨
摘要:根据实际的地基结构,在Terzaghi一维固结理论的基础上,建立粉喷桩复合地基桩间土的固结模型并求解;结合高等级公路粉喷桩加固路基工程实例,将理论计算值与现场试验结果进行沉降计算对比分析。

Abstract:According to the practical foundation shapes, the consolidation models of the soil between piles and the substratum are built and solved respectively on the theory of Terzaghi-one dimension consolidation. Connected with the projects of highway, the research draws theoretical conclusions to compare with the in-site test results of DJM composite ground.

中文标题:
粉喷桩处理软基固结计算方法的探讨
Study on Consolidation Calculation of Soft Ground Improved by DJM

作者:
胡雪梅1,刘加才2
HU Xuemei1,LIU Jiacai2
作者简介:胡雪梅,1974年生,女,江苏南京人,硕士,副教授,从事土力学教学和道路软基处理的研究。E-mail:c-x-02@yahoo.com.cn
通讯地址:
1. 南京交通职业技术学院, 江苏南京 211188;    2. 江苏省地质工程勘察院, 江苏南京 210012
1.NanjingCommunicationsInstituteofTechnology,Nanijing211188,Jiangsu,China;    2.JiangsuGeologicalInvestigationsInstitute,Nanijing210012,Jiangsu,China

中图分类号:TU472.36;TU311.4
doi:10.3969/j.issn.1007-2993.2010.03.007
出版物:岩土工程技术
收稿日期:2010-02-23
网络出版日期:2021-07-06


关键词:粉喷桩,复合地基,固结度
Key words:DJM pile,composite ground,percentconsolidation
文档包含图片数量:图片(0)张
文档包含表格数量:表格(0)个

参考文献:

基金项目:


页: [1]
查看完整版本: 粉喷桩处理软基固结计算方法的探讨